PROJECTS
Shazam Solar
Located in the NW corner of the Island, this 27.9 MW project will
support this community by powering up to 80% of the homes!
-
80 acre parcel
-
Non Agricultural, flat parcel
-
0 acres in the flood zone
-
38 MVA POI
-
Tranche II PREPA/LUMA RFP
CK1 Solar
Located on the south coast of the Island, this 30.6 MW project will
support this community by transforming a under utilized & degraded piece of land into a renewable energy facility surrounded by sunflowers!
-
80 acre parcel
-
Non Agricultural, flat parcel
-
0 acres in the flood zone
-
38 MVA POI
-
Tranche II PREPA/LUMA RFP
Rubia Solar
Located in the central south coast of the Island, this 51.1 MW project will transform a non-agricultural parcel with transmission infrastructure running through it into a renewable energy solar garden capable of powering over 5000 Puerto Rican homes!
-
200 acre parcel
-
Non Agricultural open fields
-
0 acres in the flood zone
-
115 MVA POI
-
Tranche II PREPA/LUMA RFP
Las Palmas Solar
Located in the SW corner of the Island, this 14.5 MW project will
be developed with the next round of mid size solar gardens on a wide open field in a rural area!
-
60 acre parcel
-
Non Agricultural, flat parcel
-
0 acres in the flood zone
-
13 MVA POI
-
Tranche II PREPA/LUMA RFP